Temple, Texas — IH-35 Corridor

Industrial Land for Sale & Build-to-Suit in Temple, TX

64.56 development-ready acres across two sites — one with IH-35 frontage and BNSF rail, one bordering Meta’s data center campus. Each supports up to 400,000 SF.

64.56 AC

Total Land Available

400,000

SF Buildable Per Site

2,040 FT

BNSF Rail Frontage

2

Development Sites

Development-Ready Sites

Both available for sale, ground lease, or build-to-suit.

Comparing the Two Sites

2520 N General Bruce Dr32.56 AC · IH-35 frontage · BNSF rail · heavy & light industrial zoning · stabilized areas and driveways in place
2606 W Nugent Ave32 AC · Temple Industrial Park · borders Meta’s data center campus · adjoins our 108,500 SF building

In short: General Bruce is the site if you need rail or highway visibility. Nugent is the site if you want to be inside the established industrial park, next to major data center infrastructure and with the option of taking built space alongside it.

Build-to-Suit in Temple

Build-to-suit means we deliver a finished building constructed to your specification, and you lease it, rather than adapting your operation to a building that already exists. It suits users whose requirements — clear height, power, dock configuration, rail spur — are specific enough that existing inventory does not work.

The 2520 N General Bruce Dr page includes example layouts prepared by Cerris Builders. They are there to show what the site can hold, not to limit the options.

Typical structures

  • Sale — you buy the land and develop it yourself
  • Ground lease — you lease the land long-term and build on it
  • Build-to-suit — we build to your spec and you lease the finished facility

Why Develop in Temple

Temple sits on IH-35 between Austin and Waco, about 45 minutes north of Austin, with roughly 28 million people within a two-and-a-half hour drive.

For a developing user, the practical draw is that Central Texas land and labour costs remain workable while highway and rail access do not have to be traded away. BNSF runs through the industrial corridor, and rail-served acreage that is actually available is scarce in most comparable markets.

The corridor is also attracting significant capital — Meta’s $800M hyperscale data center campus sits inside Temple Industrial Park, directly bordering our Nugent Ave parcel.

Common Questions

How much land is available?

64.56 acres total across two sites, each supporting up to 400,000 SF of building.

Is either site rail-served?

Yes. 2520 N General Bruce Dr has roughly 2,040 feet of BNSF frontage along its full west boundary.

What is the zoning?

2520 N General Bruce Dr is zoned heavy and light industrial. 2606 W Nugent Ave sits inside Temple Industrial Park and is intended for industrial, warehouse, and manufacturing use.

Can the sites be split?

Ask us. Configuration depends on what you are building and how much of the parcel it needs.

Considering a site in Temple?

Tell us the building size, use, and whether you need rail, and we will tell you which site fits.

Email Us

Opens your email app, pre-filled